If you want to streamline the entire construction process and expedite the experience as much as possible, modular homes are the sure way to go. Given the multitude of benefits, it’s easy to see why so many people are now living in modular homes. There are also a number of similarities between the construction processes of modular and site-built homes. Locating and purchasing open land is a necessary first step in either case. Moreover, you’ll need to obtain the required permits and approvals from the local city, township or municipality.
Delivery time can also vary based on the level of complexity and customization of the home, the home manufacturer’s backlog of home orders, and weather conditions at the building site. Typically, it takes about four months from home order to home move in. “But the actual construction time to build a manufactured home in the factory is just a few days,” Bowersox says. Once the modular home sections are built and arrive at the home site for placement, it generally requires about two weeks to place the home, set it up and install it.
Locating Your Desired Building Site
Utilities are then connected to city services and interior finishing is completed, including drywall tape and paint touch up, flooring and carpet connections. Finally, a customer walk through is conducted, “punch list” items are determined and are corrected, and a final city or county inspection is completed. There are many more things that will slow you down than will help you go faster when building a modular home. If you hope to move in to your modular home soon, I strongly advise that you begin working on the first step now. Planning and figuring out exactly what you want to include in your modular home plans is key to expediting the building process. Assuming that you are ready to meet with a modular home builder to complete an estimate, it will take 1-12 weeks to plan and finally order your new home.
It will take longer if you take more than a week approving your second set of preliminary plans of if you require a third or fourth draft of plans. The design must be water-tight before the walls and decks are hammered away. This stage is the factory review phase, and it’s included in the construction segment.
Here Is About how long does it take to Build the Modular Home
You need to contact your preferred builder and ask what the current timeline is for a manufactured home. First, the base frame, floor or deck of the manufactured home gets constructed on a horizontal bed using steel beams and joists. Typically, floor joists are 16 feet long and I beams are located at 2 feet and 14 feet rather than at the perimeter of the unit.

It will also go faster if the modular home builder is not too busy. The top story floor is also prefabricated and will be brought to the site together with other house walls. After ten weeks, the framework is complete, and the mud work commences. After receiving the project drawing from your modular company architecture, you can present it to the local jurisdiction for review. The process might take several weeks before final thoughts for individuals. However, a company will only need a week or two for its approvals to pass.
How Long Does it Take to Build a Modular Home?
I feel like a few months would be much more preferable to the waiting time for a traditional house. If I need to get a house in the future, then I should consider getting a manufactured one. The flooring of your modular home begins with a moisture resistant vapor barrier on the home's steel frame. Following the moisture barrier, the home builder will put down insulation and then an OSB sub floor.

Champion Home Builders is reputable for building modular homes and manufactured homes in a climate controlled environment before installation. You would get a variety of floor plans to choose from if you were to purchase a modular home. They also, based on your location, offer both single-wide and double-wide manufactured homes. Once your site has been prepared, your foundation has been laid, and the necessary building permits have been obtained, the modular home can start being constructed.
The Modular Homebook
You can accomplish delivery and installation effortlessly if you link up and work with the retailer or manufacturer. Some manufacturers have the delivery method in place that they will charge you for using. Others, however, may link you with a transport company to help you with the delivery.
First, the length of time it takes to build your home will depend on some of the build options you select. Naturally, there are going to be a handful of features that take longer to construct than others. Some of the material selections will impact the build duration as well. For example, if you select tile over laminate, the tile installation takes longer than laminate. It may also alter the construction process as the tile may need to go down after other features are installed, whereas laminate may be able to go in sooner. So while it is always faster to have a modular home built off-site than a traditional home built on-site, there are different variations to consider.
You can even select the perfect plot of land and then have the modular home shipped to the lot. There’s acommon misconceptionthat modular homes are lower in quality than homes built entirely on-site, but that’s just a myth. The best builders use the highest-quality materials and adhere to strict building standards. They also take every step necessary to build your home to all state and local codes.

In this article we break it down, from the pre-construction stage right through to handover to help you decide if a modular home is right for you. Building an access road might take time if your building site is in the middle of the forest. Here all designs are left to your taste, and only expert advice is offered, from the house design to the appliances. Companies only provide consultation and customization of your ideas. The first phase of building your modular home is the design process.
Once built, these homes are move-in ready, which means that you can immediately move into the home without needing to worry about a lengthy closing or clean-up process. This article takes a closer look at the amount of time needed to construct a modular home. If you want to build your own home, there are several great options that you can select from.

Additionally, they will determine the site preparation time, assess approval requirements, and build a budget. Once you agree on the design and the amount for completing the house, a 5% deposit will start your new home. However, for the most part, modular homes are constructed much faster than standard construction. Laying the foundation is a matter of setting up the molds and pouring the concrete for the foundation of your house.
This is why it is so important to have as many details as possible worked out in advance, so crews will have materials ready and waiting for them to install. From digging the first shovelful of dirt to getting the keys in your hand, building a home from the ground up takes an average of 6.8 months. The roof is assembled with trusses 24 inches on center and exterior sheathing. Moisture barriers are added and insulation is blown into the cavity. Manufactured homes likely qualify for financing terms similar to traditional site-built homes.