In addition to that, the site must be cleared and prepped for construction before the foundation can be established for the prefab home. Building permits must also be acquired from local authorities before construction begins. On average, however, you can expect the entire process to take at most 31 weeks. Expect the entire process to set-up your double-wide mobile home to last for roughly 21 days, including inspection.
If the site needs prepping before the home is delivered, you’re looking at a 4-6 week lead time. Some manufacturers include the delivery and installation cost in the price of purchasing a modular home. However, others sell manufactured units without including the delivery costs in the total buying price. In such a case, you, as the home purchaser, become responsible for any costs pertaining to the delivery to the site. Ensure that the foundation of your manufactured home is installed well and that it meets all the building standards. All the required utilities should be made available on-site, too.
Home Design (Architectural) Phase (4–12 Weeks)
A lot of the things that end up taking so long in any type of home construction are the intangibles. Things that are difficult to account for, such as materials, because you cannot predict them. In the event that the foundation is permanent, on-grade, or semi-permanent, the construction crew needs to place these modules with the assistance of a crane.
Your home site will have been leveled, have had a septic system installed if you have one and have had a foundation created by the time the sections of your modular home arrive. The home will stay temporarily connected while exterior walls and roofing are added to the appropriate sections. This ensures that the home's walls line up and the sections of your modular home fit together correctly before it arrives at your home site. Before floor covering finishes off a home's floor, we cut out holes for plumbing and electric and then install PEX plumbing. Once we're ready to finish the floor, we have all sorts of floor covering options like vinyl, laminate and carpeting.
Other Benefits of Building Modular
Zoning approval is another phase where the city reviews your project to ascertain it meets the required zoning regulations. If the project fails to meet the required standards, you may request a plan revision. It’s the phase where you get to creatively choose the physical aspects of your modular home.
The first step here involves constructing the manufactured home’s deck, floor, or frame on a horizontal bed with joists or steel beams. On the other hand, beams are located at 2 and 14-feet, rather than at the unit’s perimeter. The varieties developed by this manufacturer include the Mojave HUD series, Nevada HUD series, and Sahara State Code series. Due to having excellent manufacturing practices, Adventure Homes got the MHI Interior Design award in 2021. There is no timeline for the time you can take to select modular home–related features. However, you should not spend a lot of time if you want to have a home for your family as soon as possible.
Browse Floor Plans
This article will highlight ten phases that determine the number of weeks a modular home takes to complete. A Clayton Built® home combines style, quality and affordability, making it a wonderful choice for you and your family. Ready to learn more about everything that goes into building one of our homes? On our Clayton Studio blog, you can read about everything from the different products and materials we use to more about the history and trends of the off-site built housing industry. Once you’ve found your dream Clayton Built® home, learn how long it usually takes to build it and why that may vary based on the home’s features or where it’s being built.
This is most often done by pouring concrete, but you can also plastic piers. Before you move into a mobile home, it must be installed correctly for safety. If you’re moving to a pre-existing mobile home site, you may be able to move in within 2-3 weeks.
The Foundation and the Home Can be Built Simultaneously
For example, if you select a tile over a laminate, the installation of the tile takes longer than the lamination. It may also alter the construction process as the tiles may need to be lowered after other features are installed, as the laminate may be possible to use sooner. So, while it is always faster to have a modular home off-site than a traditional site-built home, there are various differences to consider. The area may need to be reinforced with steel or rebar before pouring the concrete. If the foundation isn’t raised, you should be able to pour the concrete in a few days. Some of the factors that can impact the foundation laying process include the need for inspection, plumbing, and basement waterproofing.
Depending on your specific floor plan, customizations, and any upgrades, you can expect the building process to take anywhere from one to four months. If you use preset plans, the process should take closer to 16 weeks to be completed. On the other hand, custom options allow you to personalize the home to suit your needs. Even though using a custom design can take a long time, constructing a site-building home usually takes longer at an average of weeks. Here’s a closer look at the timeline you should expect for the modular home construction process.
You will need to secure mobile home financing for the construction process to begin. Much like the process you would encounter building a traditional home, the first thing you need to cross off your list building a manufactured home is funding. Manufactured homes, on average, will take about four months to build from start to finish. Since time is of the essence, there is a need to save time wherever possible.
Modular homes are automatically considered to be move-in ready since the entire process is finished once the pieces are put together. Once the 3-4 month timeline has passed, you can immediately move into your new home. Again, you don’t have to customize your modular home, but the option is there. Work alongside a professional designer to customize your dream floor plan.
For your information, Palm Harbor Homes is the leader of manufactured and modular home development in the U.S. To avoid indecision, give yourself plenty of time to choose on a layout and choose things like flooring, appliances, and HVAC units early on — and stick to your choices. Pick out backup options in case some materials are discontinued or on backorder. For the final inspection, a municipal building code official visits the home and looks at everything that needs to be up to code.
If the home consists of 6-8 separate sections, the building process can take three days. After the installation of these pieces if finished, you can add exterior siding and stairs. As a by-product of fewer wasted materials, modular homes provide an affordable alternative to traditional home construction. With fewer scheduling delays and faster building time, you save money in numerous areas. Weather plays a massive role in traditional building delays, particularly in areas with harsh climates.
The builders will then alter the designs and send you the information and the price adjustments. So, this can be an especially quick step in the build, or it may take some time to get everything ironed out. After preparing your property and completing the build of your modular home in the factory, it’s time to move on to the finishing touches.

When a raised foundation has been built, the modules are able to be set with more convenient methods. Again, a modular home’s building schedule depends on several factors. The following are some reasons your home may require more time to build.